England
Air conditioning inspection (TM44)
Category: Electrical and energy
Type: Certificate / check
Default cycle: 60 months
Only where an air conditioning system over 12 kW is present. Inspection every 5 years.
Commonly required, check local rules. Not legal advice. Requirements vary by region and tenancy, check local rules.